| Installation |
We arrive punctually on a pre-arranged day (usually at 8 am) and will lay dust sheets leading to the room being fitted. All our equipment and your new fittings are put into this room and we operate within this area for the whole of the installation, with minimum disruption to the household. We have dust extraction equipment which starts automatically when the saw equipment is switched on.
The average time for fitting is 1-2 days depending on the size of the installation. On completion, the units are washed down and the room is vacuumed so that everything is then ready for your use. |


